NVA WASTE FACTORS ON PROJECT PERFORMANCE AT THE PT “XYZ” WAREHOUSE BUILDING, WEST JAVA, INDONESIA
Nurlaelah, Nurlaelah (2023) NVA WASTE FACTORS ON PROJECT PERFORMANCE AT THE PT “XYZ” WAREHOUSE BUILDING, WEST JAVA, INDONESIA. Engineering and Technology Journal, 8 (9). pp. 2757-2762. ISSN 2456 3358
Full text not available from this repository.Abstract
NVA waste is a common activity in practically all construction projects and can affect the performance of those projects as a whole. In Cikarang, West Java, this also occurred in the PT “XYZ” Warehouse Building Project. The goal of this study was to ascertain how the performance of PT XYZ's warehouse construction project affected waste associated with Overproduction, Inventory, Defect, Motion, Transportation, Processing (Over processing), and Waiting. The study's findings indicate that there is a "medium correlation" between overproduction, inventory, defect, motion, transportation, processing (over processing), and waiting waste and project performance. The highest influence on total waste levels is exerted by transportation waste (0.653), waste defects (0.505), waste overproduction (0.436), waste inventory (0.335), waste waiting (0.223), waste over processing (0.175), and waste motion (0.054). Key Words: NVA Waste, Construction Performance, Correlation
Item Type: | Article |
---|---|
Subjects: | T Technology > TA Engineering (General). Civil engineering (General) |
Divisions: | Faculty of Engineering / Fakultas Teknik > S1 Civil Engineering / Teknik Sipil |
Depositing User: | Nurlaelah Nurlaelah |
Date Deposited: | 29 Jan 2024 01:14 |
Last Modified: | 29 Jan 2024 01:14 |
URI: | http://repository.umj.ac.id/id/eprint/17665 |
Actions (login required)
View Item |